I sincerely apologize to have forgotten to send a reminder of this meeting.
On IJCLab side:
- 2 updated PCBs with an EICROC0 delivered to IJCLab, Friday April 12th
=> will be powered in the second part of this week
- Support was asked to IJCLab firmware engineer to 1) correct bugs; 2) improve
functionnalities. This person is presently very busy with other urgent projects.
** In relation with Satoshi's results: some results obtained last year on amplitudes/rise time/PA jitter versus channel numbers/columns: see https://box.in2p3.fr/index.php/s/92NqdXo3JQzotNH
- <EIROC0_IJCLab_ampl_RT_vs_channels.pdf> (Dominique) obtained injecting charge in one channel at a time,
- <EICROC0_ampl_vs_channels.pdf> (Dominique) obtained injecting charge in one channel at a time (another representation),
- <Ampl_RT_vs_channels.pdf> (Laurent) obtained injecting 13.8 fC charge in one channel at a time,
- <Prob_PA_Vmax.png> (Dominique) obtained injecting charge in 4 channels at a time, line by line),
- <Jitter_versus_channels.pdf> (Dominique) obtained injecting charge in 4 channels at a time, line by line),