FJPPL/compton
de
lundi 1 décembre 2008 (09:00)
à
mardi 2 décembre 2008 (12:00)
lundi 1 décembre 2008
10:00
Stacking
-
F. Zimmermann
Stacking
F. Zimmermann
10:00 - 10:30
10:30
Status of the KEK 4 mirror cavity design and tests
-
Richard Cizeron
Status of the KEK 4 mirror cavity design and tests
Richard Cizeron
10:30 - 11:00
11:00
Results of the Orsay 4 mirrors (1 inch) and Ti:Saphir cw laser: first results of the 2 inch mirrors and cw Nd:Yag laser
-
Viktor Soskov
F. Zomer
Results of the Orsay 4 mirrors (1 inch) and Ti:Saphir cw laser: first results of the 2 inch mirrors and cw Nd:Yag laser
Viktor Soskov
F. Zomer
11:00 - 11:30
11:30
Simulations on Compton positron source: status
-
T. Omori
Simulations on Compton positron source: status
T. Omori
11:30 - 12:00
12:00
The « Quantum Beam Project »
-
J. Urakawa
The « Quantum Beam Project »
J. Urakawa
12:00 - 12:30
14:30
Studies on an hybrid target for ILC and CLIC
-
Robert Chehab
Studies on an hybrid target for ILC and CLIC
Robert Chehab
14:30 - 15:00
15:00
Operational performance on Positron Production from Tungsten Monocrystalline Target at the KEKB injector linac
-
T. Suwada
Operational performance on Positron Production from Tungsten Monocrystalline Target at the KEKB injector linac
T. Suwada
15:00 - 15:30
15:30
A test of the hybrid source at CERN ?
-
R. Chehab
A test of the hybrid source at CERN ?
R. Chehab
15:30 - 16:00
16:00
The hybrid source for CLIC : some studies at CERN ?
-
L. Rinolfi
The hybrid source for CLIC : some studies at CERN ?
L. Rinolfi
16:00 - 16:30
mardi 2 décembre 2008
10:30
KEK & Hiroshima presentations
-
OMORI Tsunehiko
KEK & Hiroshima presentations
OMORI Tsunehiko
10:30 - 11:00
11:00
Results of the 2 mirrors 30000 cavity finesse
-
R. Chiche
Results of the 2 mirrors 30000 cavity finesse
R. Chiche
11:00 - 11:20
11:20
Round table discussion
Round table discussion
11:20 - 11:40
11:40
Visit to the new optical lab
Visit to the new optical lab
11:40 - 12:00