FJPPL/compton
Dec 1, 2008, 9:00 AM
→
Dec 2, 2008, 12:00 PM
Europe/Paris
Robert Chehab
Description
France Japon Collaboration
Mon, December 1
Mon, Dec 1
Tue, Dec 2
1
Stacking
Speaker
:
F. Zimmermann
Slides
2
Status of the KEK 4 mirror cavity design and tests
Speaker
:
Richard Cizeron
Slides
3
Results of the Orsay 4 mirrors (1 inch) and Ti:Saphir cw laser: first results of the 2 inch mirrors and cw Nd:Yag laser
Speakers
:
F. Zomer
,
Viktor Soskov
Slides
4
Simulations on Compton positron source: status
Speaker
:
T. Omori
Slides
5
The « Quantum Beam Project »
Speaker
:
J. Urakawa
Slides
6
Studies on an hybrid target for ILC and CLIC
Speaker
:
Robert Chehab
Slides
7
Operational performance on Positron Production from Tungsten Monocrystalline Target at the KEKB injector linac
Speaker
:
T. Suwada
Slides
8
A test of the hybrid source at CERN ?
Speaker
:
R. Chehab
9
The hybrid source for CLIC : some studies at CERN ?
Speaker
:
L. Rinolfi
Slides
Tue, December 2
Mon, Dec 1
Tue, Dec 2
10
KEK & Hiroshima presentations
Speaker
:
OMORI Tsunehiko
Slides
11
Results of the 2 mirrors 30000 cavity finesse
Speaker
:
R. Chiche
Slides
12
Round table discussion
13
Visit to the new optical lab