Pour vous authentifier, privilégiez eduGAIN / To authenticate, prefer eduGAINeu

22–24 avr. 2026
Helmholtz-Zentrum Berlin (HZB)
Fuseau horaire Europe/Rome

Tour of HZB accelerator and SRF facilities

The tour will consist as of now of five stations:

  1. BESSY II control room
  2. bERLinPro accelerator hall
  3. HoBiCaT horizontal cavity teststand and small VTS
  4. Large Vertical teststand (LVTS) and CRAFT
  5. FE-FRT development (Testing hall 2)

We will form five groups to be guided around.

A first impression of the facilities from a topview, which will be shown, can be seen in the picture below: